Black steel

Immersion Spraying Brushing
immersion pulverisation application au pinceau
VARNISH REMOVING
Decalaminor CH 100 % – 5 to 25 °C – 15 min
Sodex 110 250 g/l- 60 ° C – 60 to 120 min 250 g/l – 60 ° C – 60 to 120 min
FLUSHING STAGE (WITH INDUSTRIAL OR DEMIRENALIZED WATER)
DEGREASING STAGE
Sodex 110 50 to 100 g/l – 20 to 65 °C – min 15 min 50 to 100 g/l – 20 to 65 °C – min 15 min
Soldeg 60 100 % – 10 to 30 °C – min 15 min 100 % – 10 to 30 °C – min 15 min
FLUSHING STAGE (WITH INDUSTRIAL OR DEMIRENALIZED WATER)
DESCALING AND PICKLING STAGE
Ferinit F 50 % – 10 to 50 °C – min 1 h 50 % – 10 to 50 °C – min 1 h
Solution 3D 50 % – 10 to 50 °C – min 1 h 50 % – 10 to 50 °C – min 1 h
Decalaminox 4A 100 % – 10 to 50 °C – min 1 h 100 % -10 to 50 °C – min 1 h
NEUTRALIZATION STAGE
Neutrax HY 30 g/l – 10 to 50 °C – min 30 min 30 g/l – 10 to 50 °C – min 30 min
TEMPORARY PROTECTION
Lubril D (Dry aspect) 100 % 100 %
Lubril W (Oily aspect) 100 % 100 %
RUSTCONVERTOR
Feranet 100 %
Ferox 100 %